|
| image = | image_width = | image_alt = | caption = | type = Rapid transit | system = Beijing Subway | status = | locale = | start = | end = | stations = 19 | routes = | ridership = 182,800 (2014 Avg.) 365,000 (2014 Peak) | open = | close = | owner = | operator = Beijing Mass Transit Railway Operation Corp., Ltd | character = | depot = | stock = | linelength = | tracklength = | notrack = | gauge = | el = | speed = | elevation = | website = | map = | map_state = collapsed }} Line 7 of the Beijing Subway () is a rapid transit rail line in Beijing. It runs parallel and to the south of Line 1 and Batong Line, from the Beijing West Railway Station in Xuanwu District to Jiaohuachang (Coking Plant) in Tongzhou District. Construction began in January 2010.〔 It started test runs in September 2014 with full operation beginning on December 28, 2014.〔http://baike.baidu.com/view/1720195.htm〕 Like Line 6, Line 7 provides additional relief to the overcapacity Line 1 adding another east-west trunk line to the Beijing Subway network.〔 ==Route== Line 7 currently has 19 operational stations and is planned to have a total of 23 stations. The stations will have longer platforms that accommodate 8-train cars than existing Beijing subway station platforms which can only accommodate 6-train cars.〔(Chinese) (“4条地铁线将装屏蔽门” ‘’法制晚报’’ ) Jan. 20, 2010〕 The line was originally slated to have 17 stations, from the Beijing West Station to Baiziwan.〔 A revised plan approved by the Planning Committee of the Beijing Municipal government called for 22 stations over 23.9 km, ending in Jiaohuachang (Coking Plant) further east.〔(Chinese) ("轨道交通7号线规划方案通过专家评审" 轨道协调组 ) Aug. 7, 2008〕 A 23rd station was added at the eastern 4th Ring Road to accommodate nearby residents.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 7, Beijing Subway」の詳細全文を読む スポンサード リンク
|